Tue May 14, 2013 Rainy River Resources' Latest Results from Intrepid Zone Highlight Quality of Grades and Continuity of the Zone ... (40 KB) |
|
Tue Apr 30, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Wedge drill hole RR13-34W2 was completed to 713 metres. The main zone was intersected in a position approximately 40 metres west of mother hole RR12-34.
Last test in the hole at 695 metres shows azimuth of 359.0 degrees and inclination of 77.0 degrees.
Drilling has stopped for spring break-up. All drill equipment has been moved to the core shack site.
Bob Marvin, P.Geo., CPG, VP of ... (1 KB) |
|
Fri Apr 26, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Wedge drill hole RR13-34W2 has passed through the hanging wall dacite porphyry and entered the main foliated, sericite altered zone at approximately 590 metres down hole. Hole is currently at 604.3 metres this morning.
Latest test at 592 metres shows inclination of 79.2 degrees and azimuth of 355 degrees.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined b... (1 KB) |
|
Wed Apr 24, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Wedge drill hole RR13-34W2 is now at 504 metres this morning. Last test at 491 metres shows inclination of 81.3 degrees and azimuth of 354.5 degrees. We are drilling though a complex sequence of mafic volcanics, and quartz - feldspar porphyry dacites.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updat... (1 KB) |
|
Thu Apr 18, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-8 was completed to a depth of 761 metres this morning.
We are now preparing to move the rig to previous hole RR12-34 collar and intend to place a wedge at a depth of 250 metres to 270 metres down hole. RR12-34 was a very straight hole and thus provides a very attractive way to produce a true stepout without the risk of the hole wandering off target in the upper portion.
... (1 KB) |
|
Wed Apr 17, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-8 was at 686 metres this morning, still in the main zone.
Reflex test at 665 metres: Azimuth-25.6 degrees, dip-77.8 degrees.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates provided here. (1 KB) |
|
Tue Apr 16, 2013 Bayfield Rainy River Drilling Update, NW Ontario (1 KB) |
|
Mon Apr 15, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-8 was at 569 metres this morning in dacite unit.
Reflex test at 545 metres: Azimuth-23.8 degrees, dip-79.8 degrees.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates provided here. (1 KB) |
|
Fri Apr 12, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-8 was at 353 metres this morning in mafic volcanic unit.
Reflex test at 347 metres: Azimuth-18.6 degrees, dip-81.9 degrees.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates provided here. (1 KB) |
|
Thu Apr 11, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-8 was at 236 metres this morning in quartz eyes plagioclase porphyritic dacite unit.
Reflex test at 194 metres: Azimuth-3.8 degrees, dip-84.1 degrees.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates provided here. (1 KB) |
|
Thu Apr 11, 2013 Rainy River Resources Completes Feasibility Study: Establishes Intermediate Production Profile with 4.0 Million Ounces of Gold in Proven and Probable Reserves ... (84 KB) |
|
Wed Apr 10, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-8 was at 173 metres this morning in quartz eyes plagioclase porphyritic dacite unit.
Reflex test at 173 metres: Azimuth-3.4 degrees, dip-84.4 degrees.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates. (1 KB) |
|
Tue Apr 9, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-8 was at 56 metres this morning in quartz eyes dacite unit. Hole RR13-8 is located 45 metres south of previous hole RR12-34 collar.
Reflex test at 14 metres: Azimuth-354 degrees, dip-86.2 degrees.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates. (1 KB) |
|
Mon Apr 8, 2013 Bayfield Rainy River Drilling Update, NW Ontario ... (1 KB) |
|
Fri Apr 5, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-7 was at 515 metres this morning, back in quartz eyes dacite unit.
Reflex test at 470 metres: Azimuth-19.6 degrees, dip-83.2 degrees.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates. (1 KB) |
|
Thu Apr 4, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-7 was at 443 metres this morning in metasediment unit. Day shift changed bit and switched to new stabilizer core barrel yesterday.
Reflex test at 419 metres: Azimuth 17.4 degrees, dip 83.9 degrees.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates. (1 KB) |
|
Wed Apr 3, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-7 was at 389 metres this morning in mafic volcanic unit.
Reflex test at 368 metres shows azimuth of 19.1 degrees, dip is 84.5 degrees.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates. (1 KB) |
|
Tue Apr 2, 2013 Rainy River Resources' Intrepid Zone infill intersects 15.5 g/t gold and 86.6 g/t silver over 9 metres ... (23 KB) |
|
Mon Apr 1, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-6 was completed to 809 metres.
The next drill hole RR13-7 was moved to 15 metres due south of previous hole RR12-30 collar. The hole was started at 340 degree azimuth and 89.7 degree inclination. The purpose of this drilling is to infill the high grade zones between holes RR12-34 and RR12-30. The target zone will be around 630 metres down hole.
Burns Block Drill Hole RR1... (1 KB) |
|
Thu Mar 28, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-6 was at 767 metres this morning. The main zone started at 689 metres.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates. (1 KB) |
|
Wed Mar 27, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-6 is at 656 metres this morning, still in quartz eyes feldspar porphyritic dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates. (1 KB) |
|
Tue Mar 26, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-6 is at 590 metres this morning in quartz eyes dacite unit. The main zone is expected to start around 700 metres down hole.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates. (1 KB) |
|
Mon Mar 25, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-6 is at 518 metres this morning in quartz eyes plagioclase dacite. Bit changed in day shift yesterday. The mafic unit ended at 477 metres.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates. (1 KB) |
|
Wed Mar 20, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-6 is at 347 metres this morning. We continue through a complex, sheared sequence of dacites, mafic volcanics, volcaniclastic sediments, graphitic argillites and local brecciated, chert-carbonate-magnetite formations.
The latest test at 320 metres shows inclination of 87.4 degrees and azimuth of 38 degrees.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Pe... (1 KB) |
|
Tue Mar 19, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-6 is now at 268 metres in south-central Burns Block hole RR13-6 as of morning shift change. We remain in skarnified and hornfelsed mafic volcaninc rocks after having drilled through a sheared sequence of dacites in the upper portion of the hole.
The latest test at 262 metres shows inclination of 87.3 degrees and azimuth of 35.5 degrees.
Bob Marvin, P.Geo., CPG, VP of ... (1 KB) |
|
Mon Mar 18, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-6 is at 176 metres this morning. The hole has incepted the usual complexly interbedded package of dacites and bedded tuffs and local mafic volcanics down to 44 metres where we entered dacite. We are now in skarnified mafic volcanic rocks.
The latest test at 156 metres shows inclination of 88.7 degrees and azimuth of 34.1 degrees. The hole was started vertical. At this de... (1 KB) |
|
Thu Mar 14, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River "B" Block Exploration: Drill hole B13-6 was ended just below the target depth at 517 metres. The foliation, folding, alteration zone began at 404.5 metres.
The drill rig has been moved to the Burns Block and will be set-up today on a collar located in between previous holes RR12-34 and RR12-35.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved th... (1 KB) |
|
Wed Mar 13, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River "B" Block Exploration: Drill hole B13-6 has been drilled to 458 metres as of morning shift change. Foliation has increased below 403 metres and we are now drilling foliated, sericite altered dacite with chlorite veinlets.
Latest test at 458 metres shows azimuth of 140.8 degrees and inclination of 56.1 degrees.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided... (1 KB) |
|
Tue Mar 12, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River "B" Block Exploration: Drill hole B13-6 is at 403 metres, as of morning shift change. The inclination continues to flatten and we are now at 58.5 degrees. Foliation core angles are now cutting across the geologic rock section of north central B Block. The plan position of the hole at the present depth is approximately 50 metres past the collar position of R7B-1. Azimuth remains around 137 degrees, or southeast. Foliated and sericit... (1 KB) |
|
Mon Mar 11, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River "B" Block Exploration: Drill hole B13-6 is at 330 meters, inclination is now 62.5 degrees and azimuth is staying stable at 138 degrees. The hole has been in foliated dacites since passing below the till cover at 27 meters.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here (1 KB) |
|
Fri Mar 8, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River "B" Block Exploration: Drill hole B13-6 is now at 57 metres this morning. The hole is a 70 degree angle to the SE. Below the till we entered the quartz dacite porphyry unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Mar 7, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River "B" Block Exploration: Drill hole B13-5 was ended at noon yesterday at 392.0 metres. The rig has now been moved to a position 200 metres N45W of the collar of 2007 hole R7B-1, North-Central "B" Block.
The target of new hole B13-6 is the last fairly thick area in the B Block mag low as it pinches out Northeastward. The hole will be drilled to the ESE across the grain of the rock package in the area. The hole will provi... (1 KB) |
|
Mon Mar 4, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River "B" Block Exploration: Drill hole B13-5 is at 181.5 metres this morning. The NE "B" Block hole is vertical and is being drilled to test the rock package under a VTEM anomally. The hole has intersected a complex sequence of skarnified/hornfelsed mafic volcanics, foliated dacite.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates t... (1 KB) |
|
Fri Mar 1, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River "B" Block Exploration: Drill hole B13-4 ended at 506 meters. Hole ended in silicified, foliated and folded dacite. We will now move to the VTEM anomally in the NE portion of the B Block.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here (1 KB) |
|
Wed Feb 27, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River "B" Block Exploration: Drill hole B13-4 was at 358 metres in an angled hole. Last test at 284 metres shows azimuth of 112 degrees and inclination of 61 degrees. We have passed through a complex zone of foliated dacite volcanics that are cut by quartz porphyries and mafic dikes. Below 276 metres, the dacites are silicified and foliated.
Road construction to the planned drill site in the NE portion of the B Block is now ... (1 KB) |
|
Tue Feb 26, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River "B" Block Exploration: Drill hole B13-4 was at 275 metres this morning. Current azimuth is 110 degrees, ie 20 degrees south of east. Inclination is 62 degrees, hole was started at 68 degrees. The hole has intersected a complex sequence of foliated dacite and felsic intrusive sills.
The hole will be continued for another 24 hours at least.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined ... (1 KB) |
|
Fri Feb 22, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River "B" Block Exploration: Drill hole B13-3 is currently at 300 metres in a vertical hole. We are driilling through foliated and sericite altered dacite volcanics. The sericite alteration is overprinted by silca flooding.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Feb 20, 2013 Rainy River Resources' Intrepid Zone continues to intersect high grade gold and silver mineralization with significant widths ... (30 KB) |
|
Tue Feb 19, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River "B" Block Exploration: Drill hole B13-2 was completed to 330 metres today. The hole was started vertical but began to flatten to the west immediately. At 272 metres the inclination was 78 degrees and azimuth 281 degrees.
We are now moving to drill hole B13-3 located 25 metres north and 25 metres east of hole B13-1.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provi... (1 KB) |
|
Fri Feb 15, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River "B" Block Exploration: Drill hole B13-1 was completed to 362 metres today. The next hole B13-2 will be another vertical hole located 80 metres southwest of B13-1 continuing to follow-up on the mineralized intercept in previous 2012 hole B12-6.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Feb 14, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River "B" Block Exploration: Drill hole B13-1 is now at 262 metres this morning. The vertical hole is exploring the central portion of a 1.5 km long and 150 to 500 metre wide mag low that crosses from SW to NE across the B Block property. The mag low is coincident with the mapped position of the main district host dacite package as it is warped from E-W to NNE up and around the Black Hawk Stock. The hole is also exploring the d... (1 KB) |
|
Wed Feb 13, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River "B" Block Exploration: Drill hole B13-1 is now at 162.5 metres this morning. The hole remains essentially vertical. The sheared foliation has rotated from 25 degrees to core axis to zero degrees to core axis in the interval from 85 metres to current depth. We are now drilling essentially parallel and striaght down the shear foliation.
Drilling is planned to continue to at least 300 metres.
Bob Marvin, P.Geo., CPG, VP... (1 KB) |
|
Tue Feb 12, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Mag low target drill hole RR13-5 was ended at 281 metres yesterday morning. The main zone was encountered at 143 metres.
Rainy River "B" Block Exploration: The rig was moved to "B" Block yesterday and casing was set to 10.5 metres in vertical drill hole B13-1. Drill hole B13-1 is currently at 71 metres depth this morning. Target depth, based on previous hole B12-6, is 190 to 230 metres b... (1 KB) |
|
Mon Feb 11, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: RR13-4 was completed at 305 metres. This hole was angled at 76 degrees to the north and intersected the sericite altered main zone.
Following completion of hole RR13-4, we moved 200 meters west to drill the mag low target. The hole was started at 80 degrees incline to the north. We are now at 205 meters in hole RR13-5.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as d... (1 KB) |
|
Mon Feb 11, 2013 Rainy River Resources Provides Update on 2013 Planned Activities ... (9 KB) |
|
Wed Feb 6, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: We ended drill hole RR13-3 at 326 metres yesterday. Hole remained essentially vertical throughout. The foliated main zone was intersected at 255 metres.
Drill hole RR13-4 has been started from the same set-up as hole RR13-3 and is a 77 degree hole drilled due north. Target is the main East Burns zone in a position under the NE corner of the Burns Block property. The hole is currently a... (1 KB) |
|
Tue Feb 5, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-3 was at 300 metres this morning, hole remains essentially vertical. We have been in the main host dacite since crossing the sheared contact at the base of the skarnified mafic cap rock at 99.5 metres.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Feb 4, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drilling is progessing very rapidly, averaging 100m+ per day. Drill hole RR13-2 was completed to 443 metres on Saturday morning. After completeing hole RR13-2 we stepped east another 25 metres to within 10 metres of our east boundary. Drill hole RR13-3 was then collared and is vertical at 215 metres depth.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI... (1 KB) |
|
Fri Feb 1, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-2 is at a depth of 322 metres. Hole remains essentially vertical. The base of the mafic section at around 110 metres is marked by a shear zone. This structure separates the overlying mafic volcanic rocks from the underlying main dacite sequence.
The same structural contact was logged in RR13-1, again separating the outcropping mafic volcanics from the underlying interme... (1 KB) |
|
Thu Jan 31, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-2 was at 224 metres this morning. Base of the outcropping mafic volcanic unit in the current hole is 106 metres, approximately 20 metres deeper than in hole RR13-1 located 40 metres west of current hole.
Reflex tests are all showing a near vertical hole, >89 degrees.
We should be passing through the target zone today and will continue the hole to either 300 metres or... (1 KB) |
|
Wed Jan 30, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-2 was at 130 metres this morning. Hole is near vertical in latest reflex test at 122 metres. The collar of RR13-2 is 40 metres east of hole RR13-1. The upper 90 metres of RR13-2 are composed of altered mafic volcanic rocks. Below 90 metres the hole has entered the hanging wall dacite sequence. Hole is planned to be drilled to a depth of 300 metres.
Bob Marvin, P.Geo., ... (1 KB) |
|
Mon Jan 28, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-1 was at 332 metres in the main sericite zone. The hole is turning clockwise from SSW to NNW with an azimuth of 341.8 deg and a dip of 86.6 deg.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Fri Jan 25, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-1 was at 120 metres this morning and has entered the dacite.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Jan 24, 2013 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR13-1 was collared approximately 25 metres from the NE corner of the property. Collar sits on outcropping mafic volcanics, part of the middle portion of the normal hanging wall sequence.
Shows dip of 89.4 degrees and azimuth of 238 degrees but need to likely wait until we are through the mafics and into the main dacite sequence to get a reliable test.
Would look for this... (1 KB) |
|
Mon Dec 17, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR12-34-W1 was completed to 879 metres.
The drill rig has been shut down and the crew have been sent home for the holidays. Drilling is expected to resume mid January.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Dec 12, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR12-34-W1 was at a depth of 797 metres as of yesterday evening. Drilling hard dacite now but will keep drilling.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Dec 11, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR12-34-W1 was at a current depth of 768 metres this morning. We have drilled wedge hole RR12-34W1 from the RR12-34 mother hole. Main zone interval starts from 615 metres. RR12-34W1 has not yet seen the footwall contact and is currently in sericite altered and foliated dacites at 768 metres and counting. The plan is to continue drilling for a couple more days and see what happens.... (2 KB) |
|
Fri Dec 7, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR12-36 was ended at 881 metres on December 5th. The hole was then Gyro surveyed.
Drill rig was then moved back to hole RR12-34, steel lowered to bottom and a gyro survey done. Following the survey, a wedge was set at 525 metres. First test in RR12-34W at 530 metres shows 359.8 degree azimuth and 82.9 degree dip vs. 4.0 degree azimuth and 84.75 degree dip at same depth in moth... (1 KB) |
|
Wed Dec 5, 2012 Rainy River Resources' Intrepid Zone Continues to Expand, Demonstrating Excellent Gold and Silver Grades and Widths Near Surface ... (23 KB) |
|
Tue Dec 4, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR12-36 is now at 838.87m in moderately foliated dacite sericite alteration.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Dec 3, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR12-36 was at 802 metres as of morning shift change. Still drilling through the foliated and altered dacite zone. New bit on last night. Last test at 710 metres shows 81.5 degree dip and 36.4 degree azimuth.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Fri Nov 30, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR12-36 was at 611 metres at the rig this morning, have 596 metres in the core shack. We have drilled through the last (likely) of the complex, interbedded package of mafic volcanics, volcaniclastic sediments and dacites and are now in the main hanging wall dacite unit. We do not have the latest test from the 560 metres area but we are at either 82.6 or 82.3 degrees for inclinati... (2 KB) |
|
Thu Nov 29, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR12-36 was at 565 metres at morning shift change. Drilling through a complex sequence of mafic volcanics and rare dacite intrusions (and or volcanics). Rocks are locally folded and locally brecciated below 474 metres.
Latest test at 554 metres shows inclination of 83.0 degrees and azimuth of 32.5 degrees. The trend of very slow flattening is continuing as predicted from oth... (2 KB) |
|
Wed Nov 28, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR12-36 just passed 500 metres this morning, core to 488 metres in the shack. Last test at 454 metres shows inclination of 83.4 degrees. The fairly rapid flattening seen from 100 to 300 metres has stopped and we now are losing less than a degree per 100 metres. This pattern is seen in all holes in the area and bodes well for holding onto most of the inclination from here to targe... (2 KB) |
|
Mon Nov 26, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR12-36 was at 350 metres this morning. Drilling through the usual mafic volcanic sequence. Last test back at 302 metres shows azimuth of 19 degrees and inclination of 85 degrees. The hole is flattening more rapidly than hole RR12-35 which is probably a good thing. We will know when we get to 700 metres.
Minus 20 this morning.
Bob Marvin, P.Geo., CPG, VP of Exploration is... (1 KB) |
|
Fri Nov 23, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR12-36 is a SW stepout on hole RR12-35. Hole was at 150 metres this morning, have passed through highly magnetic mafic volcaninc near surface and now into a low mag dacite.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Nov 20, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-35-W1 was at 766.2 metres this morning. Appears we are just getting into the footwall now, maybe.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Nov 19, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-35-W1 was at 749 metres this morning. We entered the foliated, altered dacite main zone at 630 metres. Currently pulling for bit change then will proceed to the footwall. Last test at 662 metres shows azimuth of 2.4 degrees and inclination at 75.9 degrees. We should be right around 40 metres above RR12-35 at this point.
Next hole is planned as a 25 metre SW stepout which wi... (1 KB) |
|
Tue Nov 13, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-35-W1 was at 403.5 metres this morning. The first test below the wedge yesterday showed a good 1.5 to 2 degrees of flattening. Just what we wanted for the depth we placed the wedge at and now can plan on hitting the target zone 15 to 20 metres higher at around 725 metres.
Currently drilling through a complex sequence of mafic volcanics and interbedded volcaniclastic sedimen... (1 KB) |
|
Tue Nov 13, 2012 Rainy River Resources intersects significant near-surface gold mineralization at Intrepid Gold-Silver Zone, and extends Intrepid 60 metres east ... (19 KB) |
|
Mon Nov 12, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-35 was completed to 788 metres after passing through main zone. Last test at 764 metres shows inclination of 83.4 degrees and azimuth of 354.4 degrees.
It was decided to place a wedge at 350 metres in current drill hole RR12-35 in order to bring the inclination up by 1 to 2 degrees. The wedge was successfully installed early this morning and we are now drilling new hole R... (1 KB) |
|
Thu Nov 8, 2012 Rainy River Resources Extends Intrepid Gold-Silver Zone 125 Metres Down Dip ... (24 KB) |
|
Wed Nov 7, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-35 was at 691 metres this morning. The main zone started at 670 metres. The inclination at 662 metres is 84.0 degrees.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Nov 6, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-35 was at 623 metres this morning in quartz eyes dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Nov 5, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-35 was at 503 metres this morning in quartz eyes dacite unit. The inclination at 476 metres is 85.2 degrees.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Fri Nov 2, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-35 was at 374 metres this morning in quartz eyes plagioclase porphyritic dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Nov 1, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-35 was at 278 metres this morning in quartz eyes dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Oct 31, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-35 was at 182 metres this morning in mafic volcanic unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Oct 30, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-34 was completed to 689 metres after intercepting main zone.
The next drill hole RR12-35 was moved 45 metres southwest of hole RR12-34 to chase down plunge previous holes RR12-12/RR12-30 high grade shoot. The hole started with an initial 353 degree azimuth and 89.5 degree inclination. It was at 60 metres this morning. The hole started in argillitic iron formation, followe... (1 KB) |
|
Mon Oct 29, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-34 was at 680 metres this morning in the main zone. Latest test at 653 metres: dip-83.5 degrees, azimuth-9.1 degrees.
The main zone started at 595 metres. The hole will be off main zone any time, planning to move drill to the next spot in the afternoon.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approv... (1 KB) |
|
Fri Oct 26, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-34 was at 482 metres this morning in mafic volcanic unit. The test at 449 metres: dip 85.4 degrees, Azimuth 1.6 degrees.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Oct 25, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR12-34 was at 434 metres this morning in quartz eyes dacite volcanic unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Oct 24, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill hole RR12-34 was at 374 metres this morning still in mafic volcanic unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Oct 23, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-34 was at 290 metres this morning. Have gone through intermediate volcanic and now back to mafic volcanic unit again.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Oct 22, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-33 was completed to 787 metres. New Drill Hole RR12-34 was at 224 metres this morning in mafic volcanic unit. The dip is 88 degrees at 194 metres.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Oct 22, 2012 Rainy River Resources Identifies New Gold-Silver Zone One Kilometre East of the Rainy River Open Pit ... (116 KB) |
|
Fri Oct 19, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-33 is below 750 metres this morning. Still seeing soft rock and sericite alteration. Local white quartz veins below 745 metres. Current azimuth is 352 degrees and dip is 69.8 degrees.
The next drill hole RR12-34 has been set-up 25 metres west and 25 metres south of hole RR12-30. Plan is to drill another very steep hole to extend previous holes RR12-12 and RR12-30 miner... (1 KB) |
|
Tue Oct 16, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-33 is at 637 metres this morning. Hole entered the foliated, sericite, silica, biotite, epidote altered zone at 565.5 metres. Intending to continue the hole below 700 metres.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Oct 10, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-33 is now at 435 metres this morning. We are passing through a complex inter layered sequence of mafic volcanics and porphyritic quartz eye dacites. Latest test at 428 metres shows Azimuth at 347.2 degrees and Dip at 75.7 degrees. We are turning east much more rapidly than we are flattening.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by N... (1 KB) |
|
Wed Oct 10, 2012 Rainy River Resources Announces 6.2 Million Ounces of Gold in Measured and Indicated Resources, and 2.3 Million Ounces of Gold in Inferred Resources ... (36 KB) |
|
Tue Oct 9, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
East Burns Block hole RR12-33 is at 357 metres. The azimuth at 326 metres was 344.8 deg and the dip was 77.1 deg.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Oct 2, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-32 is now at 644 metres this morning. We entered the main sericite altered zone at 564.15 metres yesterday. Last Reflex test is from 632 metres and shows the azimuth to be 12.6 degrees and the inclination to be 70.5 degrees.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are ... (1 KB) |
|
Fri Sep 28, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-32 is at 467 metres as of shift change this morning. Currently drilling through very hard quartz eye dacites. We are now below the interbedded dacite/mafic section and into the main hanging wall dacite unit.
Latest test shows continued trend of very slow flattening and fairly rapid turning to the east that began around 250 metres. At 467 metres we are at 7.2 degree azimu... (1 KB) |
|
Wed Sep 26, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-32 was at 342 metres this morning. The hole is now staying steep at 74.1 degrees (unchanged from last test) turning fairly quick to the east, azimuth now at 4.2 degrees, was 1.3 degrees at previous test 51 metres back up hole.
Two RR rigs remain on our east boundary.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and... (1 KB) |
|
Tue Sep 25, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-32 was at 269 metres this morning in quartz eyes plagioclase porphyritic dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Sep 24, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-31 was completed to 691.5 metres after intercepting main zone.
The next drill hole RR12-32 was moved 42 metres north and 42 metres west of hole RR12-31. This is a further west stepout hole for the Eastern Burns Discover.
Drill Hole RR12-32 was at 71 metres this morning in quartz eyes dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as de... (1 KB) |
|
Fri Sep 21, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-31 was at 644 metres this morning in the main zone.
RR now has three rigs drilling near our eastern fence.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Sep 20, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-31 was at 590 metres this morning in quartz dacite unit. The main zone started at 570 metres.
RR has two rigs drilling near our eastern fence now.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Sep 19, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-31 was at 521 metres this morning in quartz dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Sep 18, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-31 was at 425 metres this morning in quartz eyes plagioclase porphyriyic dacite volcanic unit.
The drilling crew are moving the water pump to the other pond in the north of the core shack this morning.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Sep 17, 2012 Bayfield Rainy River Drilling Update, NW Ontario Bayfield Rainy River Drilling Update, NW Ontario
Rainy River Eastern Burns Block Exploration: Hole RR12-31 was at 377 metres this morning, is in quartz eyes dacite volcanic unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Fri Sep 14, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-31 was at 236 metres this morning in mafic volcanic unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Sep 13, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-31 was at 140 metres this morning in quartz eyes plagioclase porphyritic dacite unit. The latest downhole test at 116 metres shows Azimuth at 359.3 degrees, Dip is 69.0 degrees.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Sep 12, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-31 was at 35 metres this morning in quartz eyes plagioclase porphyritic dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Sep 11, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-30 was completed to 668 metres last night after intercepting main zone. The next drill hole RR12-31 was moved to 40 metres east and 125 metres south of hole RR12-4 (right on the south fence). The hole will be drilled with an initial 355 degree azimuth and 70 degree inclination. The target of hole RR12-31 is to test the west extension of the East Burns Discovery.
Bob Marvin, P.Ge... (1 KB) |
|
Mon Sep 10, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-30 was at 653 metres this morning. Still in the main zone.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Fri Sep 7, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-30 was at 467 metres this morning in quartz eyes dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Sep 6, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Rainy River Eastern Burns Block Exploration: Drill Hole RR12-30 was at 431 metres this morning in sedimentary unit. The hole is staying straight: 87 degree inclination at 422 metres.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Sep 5, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Rainy River Eastern Burns Block Exploration: Hole RR12-30 was at 380 metres this morning in quartz eyes dacite unit. The latest down hole test at 371 metres: Azimuth-4.3 degree, Dip-87 degree.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Sep 4, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
The drill rig has moved back to the eastern portion of the Burns Block after completing one deep hole to 836 metres and 5 approx. 100 metre deep holes on the western side to attempt to extend the RR11-71 hole mineralization up dip.
Drill Hole RR12-30 was at 311 metres in mafic volcanic unit this morning. It was collared about 30 metres northeast of hole RR12-4 with an initial 355 degree azimuth and 89.7 degree dip. The target is 10-15 met... (1 KB) |
|
Wed Aug 29, 2012 Rainy River Resources' Project Updated With Higher Grades and Lower Costs ... (254 KB) |
|
Mon Aug 27, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Western Burns Block Exploration:
Hole RR12-25 was completed to 141 metres and was drilled eastward from the same collar as RR12-24. The next hole, RR12-26, is going to be collared in between holes RR12-23 and RR12-24.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Aug 22, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Western Burns Block Exploration:
Drill Hole RR12-23 was completed to the RR boundary to 836 metres. Final dip is 78.9 degrees and azimuth is 13.0 degrees. Very consistent azimuth data for the entire hole, likely reliable and this is backed-up by the changes in foliation to core axis angles seen in the logging.
We will now collar drill Hole RR12-24 20 metres north of Hole RR12-23. Hole will be drilled vertical, facing east and likely will drill another 65 degree hole e... (1 KB) |
|
Tue Aug 21, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Western Burns Block Exploration:
Drill Hole RR12-23 is at 808 metres this morning. Still drilling through quartz eye dacites with a high temperature potassic alteration assemblage.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Aug 16, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Western Burns Block Exploration:
Drill Hole RR12-23 is at 601 metres this morning. Drilling through highly foliated and folded dacite rocks. Rocks are structurally complex, folded, foliated and contains numerous faults at near parallel to core axis. Last test at 596 metres shows dip at 83 degrees and azimuth backing up west a bit to 12.7 degrees.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the ... (1 KB) |
|
Wed Aug 15, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Western Burns Block Exploration:
Drill Hole RR12-23 is at 536 metres this morning at shift change. Slowly making our way towards the 600 metre target area.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Aug 14, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Western Burns Block Exploration:
Drill Hole RR12-23 is at 500 metres this morning at shift change. Moving the water supply pump this morning but will be drilling again very soon.
Reflex tests continue to show dips in the 84 to 85 degree range and azimuths are moving from 355 degrees at 100 metres to the 12.7 degrees current reading, suggesting a slow wrap east as normal. Likely the bit is behind the drill (drill is facing south, not the usual north), slowly flattening ... (1 KB) |
|
Mon Aug 13, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Western Burns Block Exploration:
Drill Hole RR12-23 is at 448 metres drilling through variably altered dacite volcanics or intrusive. The top of the targeted 433 Zone is expected at 600 metres plus or minus 50 metres.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Aug 2, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-22 ended at 608 metres. Rainy River Resources is drilling on the ENE extension of the East Burns discovery.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here (1 KB) |
|
Mon Jul 30, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-22 was at 433.6 metres today. Dip is 80.8 degrees. We have just entered the hanging wall dacite package beneath the complex mafic tuffs, which overlay the main dacite host rock. Still approximately 150 metres from target but dip tests indicate we will test the target area between the intercepts in RR12-4 and RR12-12.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provi... (1 KB) |
|
Thu Jul 26, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-22, collared at previous hole RR12-4 site is at 250 metres this morning. Hole started at 85 degrees with the target being the plunging shoot down dip of hole RR12-4. The hole has now flattened to around 83 degrees so should be in good shape to achieve a 40 metre downdip step-out from hole RR12-4. Geology is typical with interbedded dacites and mafic flows, volcaniclastic sediment.
Bob Marvin, P.Geo., CPG, VP of Explorat... (1 KB) |
|
Mon Jul 23, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-21 was ended this morning at 611 metres. Main zone was intersected from 523 metres. Now moving back to hole RR12-4 collar and will drill an 85 degree hole to get under the zone up dip in RR12-4.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Fri Jul 20, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Dill Hole RR12-21 is at 427m and is now flattening nicely. The drill is in quartz eye dacite now after passing through the usual mafic tuffs, fragmental volcanic, exhalative cherty iron formations. Expect to reach the target depth over the weekend.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Jul 17, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Dill Hole RR12-21 was at 224 metres this morning, is in quartz eyes plagclase porphyritic dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Jul 16, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Dill Hole RR12-21 was at 149 metres this morning, is in quartz eyes dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Fri Jul 13, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-20 was completed at 624.3 metres yesterday afternoon.
The next hole RR12-21 was moved to the same collar of RR12-18, with initial 355 degree azimuth, 82 degree inclination. It was at 17 metres this morning.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Jul 11, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-20 was at 554 metres this morning, starting the main zone at 550 metres.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Jul 10, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR11-20 was at 497 metres this morning in quartz eyes dacite hanging wall unit. The main zone is expected to start around 560 metres.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Jul 9, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-20 was at 452 metres this morning, is in quartz eyes dacite unit. There are two RR rigs drilling couple hundred metres east of Burns Block.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here (1 KB) |
|
Fri Jul 6, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-20 was at 245 metres this morning, is in lapilli tuff unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here (1 KB) |
|
Thu Jul 5, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-20 was at 140 metres this morning in quartz eyes plagioclase porphyritic dacite unit.
RR12-20 hole collar is 15 metres west of previous hole RR12-19 and 13 metres south of hole RR12-3. Dip is 83 degrees.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Jul 4, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-19 was completed to 635 metres yesterday afternoon after intercepting main zone.
The next drill hole RR12-20 was moved to 30 metres west of previous hole RR12-5 last night. It was at 29 metres this morning in quartz eyes plagioclase porphyritic dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Jul 3, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
RR12-19 was at 554 metres this morning. Started the main zone at 552 metres.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Fri Jun 29, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
RR12-19 was at 425 metres this morning, is metasediment unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here (1 KB) |
|
Thu Jun 28, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-19 was at 353 metres this morning in mafic volcanic unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Jun 27, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-19 was at 251 metres this morning in mafic volcanic unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Jun 26, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-19 was at 50 metres this morning in quartz plagioclase porphyritic dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Jun 25, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-18 was completed to 680 metres after intercepting main zone.
The rig has been moved to the next collar location to begin hole RR12-19, in-between holes RR12-5 and RR12-3.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Fri Jun 22, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-18 was at 482 metres this morning, is in quartz eyes dacite hanging wall unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Jun 21, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-18 was at 416 metres this morning in quartz eyes dacite unit. The main zone is expected around 530 metres.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Jun 20, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-18 was at 341 metres this morning in mafic volcanic unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Jun 19, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-18 was at 290 metres this morning in mafic volcanic unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Jun 18, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-18 was at 245 metres this morning in quartz eyes plagioclase porphyritic dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Fri Jun 15, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Burns Block east fence infill drill hole RR12-18 was at 68 metres this morning in quartz eyes dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Jun 14, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-17 was completed to 692 metres yesterday at midnight. The drill has been moved to the next spot: in between of holes RR12-7 and RR12-5. It will be drilled at an 84 degree dip.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Jun 13, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-17 was at 650 metres this morning. The main zone started at 577 metres.
The drill will be moved to the planned next spot which is in between RR12-5 and RR12-7.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Jun 11, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-17 was at 528.5 metres this morning and seeing the onset of foliation and the occurrence of mafic dikes, all indicating we are now passing into the top of the zone.
The plan for the next few weeks is to fill-in the previous holes RR12-3, RR12-4, RR12-5 and RR12-7 fence to 15 metre spacing. This will require 3 to four holes to 650 metres. We are currently averaging around 45 metres per 24 hours.
There is a very interes... (1 KB) |
|
Wed Jun 6, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-17 was collared along the east Burns boundary 36 metres east of previous hole RR12-7. The target is the main zone at around 600 metres depth. Currently at 333.5 metres in the hornfelsed volcaniclastic seds. Azimuth is 358 degrees, inclination is 81.5 degrees.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Fri Jun 1, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-16 was completed at 809 metres this morning. Drill rig now moving to the East fence.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu May 31, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
We are still drilling below the main zone on drill hole RR12-16. This is the first attempt to look for mineralization in the more northerly zones of belt in east Burns.
We are now at 750 metres, 120 metres below the main zone within sheared and folded dacite wall rocks. Inclination in now down to around 76 degrees.
Current plan is to drill another 24 hours to see if any additional zones can be hit in 800 metre area.
Bob Marvin, P.... (1 KB) |
|
Tue May 29, 2012 Rainy River Resources Intersects 4.5 g/t Gold Over 55.5 Metres in ODM Zone, and 3.3 g/t Gold Over 349 Metres ... (297 KB) |
|
Mon May 28, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-16 was at 621 metres this morning below the main zone now. Will likely carry on to 750 metres or so to see what is down there. Bit went again last night, we are pretty much burning a bit a day right now.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu May 24, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-16 was at 392 metres this morning. Well into the hanging wall dacites. Zone expected just below 500 metres.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue May 22, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-15 was completed Saturday afternoon at 746 metres. The current dril hole, RR12-16, was collared 29 metres west of RR12-8. The target is infill in the wide area between RR12-7 and 8 on the east and RR12-5 on the west. The hole was at 131 metres yesterday.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed May 16, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-15 was at 673 metres this morning in main zone. Expect to complete hole today and have staked the next hole RR12-16, 30 metres west of previous hole RR12-8.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue May 15, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-15 was at 657 metres this morning in main zone. Hole is steep, now 78 degrees, azimuth shows 4 degrees or just east of due north.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon May 14, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-15 was at 617 metres this morning. We entered a zone of foliation at 598 metres downhole. Appears to be the top of the target zone. Hole is staying very steep at 79 degrees. This angle is likely a big part of the reason we are having to chase the zone deeper in both holes RR12-14 and now in RR12-15.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approve... (1 KB) |
|
Fri May 11, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-15 was at 471 metres this morning at shift change. A foliation zone started at around 450 metres, alteration picking up as well. Still a 100 metres above the target main zone.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu May 10, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-15 was at 410 metres this morning. The geology in the hole is following that seen in the up dip of hole RR12-12. Three days more should get us into the lower portion of the zone.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon May 7, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-15 was at 75.7 metres this morning, collared 32 metres due south of RR12-12. Was collared 30 metres south until casing got broken off in the hole. Rig then moved south for restart yesterday. We are now back across onto the west side of a fault and are seeing the same sequence of rocks as in hole RR12-12, mafic volcanic off the top then into dacite below.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person ... (1 KB) |
|
Fri May 4, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-14 was completed to 704 metres last night after encountering the main zone from 610 metres.
We have now moved the drill rig 30 metres due south of Hole RR12-12 to begin Hole RR12-15.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu May 3, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-14 was at 672 metres this morning. Will keep drilling as we have crossed a structure up hole and a 2nd zone may still be below the bit.
In other news, RR is now drilling along our east boundary.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed May 2, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-14 was at 567 metres this morning in quartz eyes dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue May 1, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-14 was at 530 metres this morning in quartz eyes plagioclase porphyritic dacite unit. The main zone is expected about 550 metres.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Apr 30, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-14 was at 473 metres this morning in quartz eyes plagioclase porphyritic dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Fri Apr 27, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-14 was at 350 metres this morning in mafic volcanic unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Apr 26, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-14 was at 233 metres this morning in quartz eyes dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Apr 25, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-14 was at 158 metres this morning in quartz eyes dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Apr 24, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-13 was completed to 557 metres yesterday afternoon after intercepting the main zone. The next hole RR12-14 was moved to 40 metres east of RR12-13. It was at 53 metres this morning in quartz eyes dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Apr 23, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill Hole RR12-13 was at 536 metres this morning. Entered the main zone at 476 metres. Planning to cut off current hole this afternoon. Moving next hole to 40 metres east.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Fri Apr 20, 2012 Bayfield Rainy River Drilling Update, NW Ontario (1 KB) |
|
Thu Apr 19, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-13 was at 164 metres this morning. Good drilling, 130 metres for last 24 hours. Drill is in quartz eyes dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Apr 18, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-12 was completed to 617 metres after intercepting main zone.
The next hole RR12-13 is being drilled with an initial 75 degree inclination from the same setup as RR12-12. Hole RR12-13 was at 35 metres this morning.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Apr 17, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-12 was at 587 metres this morning. Intercepted the main zone from 547 metres.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Apr 16, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-12 was at 508 metres this morning in quartz eyes dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Fri Apr 13, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-12 was at 398 metres this morning in quartz eyes dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Apr 12, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-12 was at 347 metres this morning in mafic volcanic unit. The main zone is expected around 530 metres.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Apr 11, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-12 was at 284 metres this morning in quartz eyes dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Apr 10, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-12 was at 251 metres this morning in quartz eyes dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Apr 9, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-11 was completed to 345 metres after intercepting the main zone.
The next hole RR12-12 was moved 50 metres south of holes RR12-3 & 4. It is being drilled at a 356 degree azimuth and a 83 degree inclination. RR12-12 was at 188 metres this morning in quartz eyes feldspar porphyritic dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the dri... (1 KB) |
|
Thu Apr 5, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-11 was at 314 metres this morning. Intercepted the main zone at 290 metres.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Apr 3, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-11 was at 153 metres this morning, in the mafic volcanic unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Apr 2, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-10 was completed to 431 metres.
The next hole RR12-11 is being drilled at a 65 degree dip from the same collar as hole RR12-10. Drill hole RR12-11 was at 107 metres this morning in mafic volcanic unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Fri Mar 30, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-10 was at 410 metres this morning in the sub main zone. Planning to cut off the hole by noon today.
The next hole RR12-11 will be drilled at a 65 degree dip from the same collar as hole RR12-10. The purpose is to chase for shallow mineralization up dip of the main zone.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are ... (1 KB) |
|
Thu Mar 29, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-10 was at 350 metres this morning and entered the main zone at 330 metres.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Mar 28, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-10 was at 278 metres this morning in quartz eyes dacite unit. The main zone is expected around 350 metres.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Mar 27, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-10 was at 197 metres this morning in quartz eyes dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Mar 26, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-9 was completed to 499.5 metres after intercepting main zone.
The next hole RR12-10 is being drilled at a 74 degree inclination from the same setup as hole RR12-9. It will give us about 75 metres further step out towards the north. Hole RR12-10 was at 134 metres this morning in mafic volcanic unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved t... (1 KB) |
|
Fri Mar 23, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-9 was at 416 metres this afternoon and entered the main zone at 402 metres.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Fri Mar 23, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-9 was at 353 metres this morning in quartz eyes dacite hanging wall unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Mar 22, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-9 was at 308 metres this morning in intermediate volcanic unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Mar 21, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-9 was at 218 metres this morning in mafic volcanic unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Mar 20, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Drill hole RR12-9 is 65 metres straight north of hole RR12-8. It is being drilled with an initial 355 degree azimuth, 84 degree inclination and is at 137 metres this morning in the mafic volcanic unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Mar 19, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
East Burns drill Hole RR12-8 was completed to 632 metres yesterday. The next hole RR12-9 was moved to 65 metres straight north of hole RR12-8. It is being drilled with an initial 355 degree azimuth, 84 degree inclination and is at 95 metres this morning in quartz eyes dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted he... (1 KB) |
|
Fri Mar 16, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
East Burns drill Hole RR12-8 was at 590 metres this morning and is still in sub zone.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Mar 15, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
East Burns drill Hole RR12-8 was at 554 metres this morning.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Mar 14, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
East Burns drill Hole RR12-8 was at 476 metres this morning. Entered the main zone at 462 metres downhole. The next hole RR12-9 is planned 40 metres straight north from hole RR12-8.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Mar 13, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
East Burns drill Hole RR12-8 was at 386 metres this morning in dacite hanging wall unit. We expect the main zone about 475 metres downhole.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Mar 12, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
East Burns drill Hole RR12-8 was at 311 metres this morning in dacite hanging wall unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Fri Mar 9, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
East Burns drill Hole RR12-7 was completed to 635 metres yesterday morning. The next hole RR12-8 was moved to 50 metres north of RR12-7 yesterday afternoon. It is being drilled at initial 355 degree azimuth and 83 degree inclination. The hole was at 50 metres in dacite unit this morning.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are po... (1 KB) |
|
Thu Mar 8, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
East Burns drill Hole RR12-7 is at 620 metres this morning in dacite footwall. Planning on moving the next hole to 50 metres straight north with initial 355 degree azimuth and 83 degree inclination.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Mar 7, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
East Burns drill Hole RR12-7 is at 533 metres this morning. It entered the main zone at 515.5 metres.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Mar 1, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
East Burns drill Hole RR12-7 is at 338 metres this morning. We are in the lower argillite unit now, waiting to enter the hanging wall main dacite package. Main zone should be below 500 metres.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Feb 27, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
East Burns drill Hole RR12-7 is at 79 metres this morning in the upper sequence dacite volcanic rocks. Hole RR12-7 was collared right against our east property fence. It is a 32 metre east stepout from holes RR11-5 and 6. Angle is 83 degrees and azimuth is 357 degrees.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Fri Feb 24, 2012 Rainy River Resources Announces 5.72 Million Ounces of Gold in Measured and Indicated Resources, and 2.25 Million Ounces of Gold in Inferred Resources ... (23 KB) |
|
Thu Feb 23, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
East Burns drill Hole RR12-6 is at 395 metres this morning and is now in the hanging wall dacites. We expect the zone at 470 to 490 metres. Couple more days.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Feb 21, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
East Burns drill Hole RR12-5 was completed to 630 metres. The next hole RR12-6 is being drilled from the same collar as RR12-5 with a 75 degree dip and was at 263 metres this morning.
Rainy River B Block Exploration:
B Block drill Hole B12-6 was completed to 270 metres this morning with a 50 degree dip and 11 degree azimuth. The hole was a 40 metre east step-out from B12-5. This now completes the phase 1 drill program on the B Block.
Bob M... (1 KB) |
|
Wed Feb 15, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
East Burns drill Hole RR12-5 is at 443.8 metres this morning and has entered the hanging wall dacites.
Rainy River C Block Exploration:
C Block drill Hole C12-4 was completed this morning to 578 metres and ended in sedimentary rocks.
Rainy River B Block Exploration:
B Block drill Hole B12-5 is at 253.5 metres this morning after drilling through several zones of sericite alteration of the dacites.
Bob Marvin, P... (1 KB) |
|
Mon Feb 13, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
East Burns drill Hole RR12-5 is now at 235 metres this morning and is drilling into the upper section of the hanging wall. Target is the eastward extension of the main zone at around 500 metres depth. We have another 25 or 30 metres between RR12-5 and our east boundary and around 110 metres to the south boundary. Plenty of room for additional 30 metre spaced drilling before 15 metre infill is done.
RR continues to drill south of the Burn... (2 KB) |
|
Wed Feb 8, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
East Burns drill hole RR12-4 is at 550 metres this morning and will be completed late today. Hole RR12-4 was a 37 metre east stepout from previous hole RR12-3. Current dip on this hole is a steep 79 degrees. It flattened less than hole RR12-3 thus we entered the target 37 metres east and 30 metres deeper in RR12-4 than in hole RR12-3. Next, we will step back to the west of hole RR12-3. We will likely end up infilling to 15 metre spacings in... (2 KB) |
|
Tue Feb 7, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Burns East Hole RR12-4 is at 521 metres this morning. Entered the target zone at approx. 512 metres.
Rainy River C Block Exploration:
C Block Hole C12-3 is at 650 metres this morning. Likely will end hole tomorrow. Seeing mafic tuffs and some seds and what are likely gabbros.
Rainy River B Block Exploration:
B Block hole B12-3 has been completed to 318 metres. Now moving rig back to south boundary of the B Block. Ta... (1 KB) |
|
Mon Feb 6, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Burns East Hole RR12-4 is at 475 metres this morning in the main dacite hanging wall. RR is now drilling with two rigs on this same geology from ground south of the Burns Block.
Rainy River C Block Exploration:
C Block Hole C12-3 is at 575 metres at morning shift change. We intend to drill into a high mag gradient 100 metres further before completing the hole tomorrow. The hope is that the gradient is a geologic contact. Next... (2 KB) |
|
Fri Feb 3, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Burns East Hole RR12-4 is at 250 metres this morning now into the dacite hanging wall.
Rainy River C Block Exploration:
C Block Hole C12-3 is at 326 metres this morning and drilling sedimentary rocks.
Rainy River B Block Exploration:
Drill on B Block hole B12-3 is not turning as the drillers ran out of casing shoes and bits.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-10... (1 KB) |
|
Thu Feb 2, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Burns East Hole RR12-4 is at 167 metres this morning in mafic tuffs.
Rainy River C Block Exploration:
C Block Hole C12-3 is at 257 metres this morning in a fragmental mafic unit. Plan to drill hole to approx. 500 metres.
Rainy River B Block Exploration:
B Block Hole B12-2 was completed to approx. 400 metres this morning. The next hole B12-3 is being drilled north of Bayfield's core shack in a due west direction with... (1 KB) |
|
Tue Jan 31, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Burns East Hole RR12-3 is at 580 metres this morning and entered target zone at 510 metres, earlier than expected. Seeing sericite alteration.
Rainy River C Block Exploration:
C Block Hole C12-3 is now running casing. There were issues with the long move, frozen waterline etc. but all seems in order now. The target of the hole is to cross cut the remaining geology to the far north boundary of the block in the continued search fo... (2 KB) |
|
Mon Jan 30, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Burns East Hole RR12-3 is at 461 metres this morning and still cutting through the hanging wall dacites. Dip is approx. 79 degrees and the azimuth is 3 degrees.
Rainy River C Block Exploration:
Hole C12-2 was completed to 881.4 metres. Final dip was 30 degrees and azimuth was 334 degrees. Hole ended in mafic tuffs. C Block hole C12-3 getting cased this morning.
Rainy River B Block Exploration:
B Block Hole B12-1 a... (1 KB) |
|
Fri Jan 27, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
Burns Block East Hole RR12-3 now at 321 metres this morning and has now drilled through the mafic hanging wall rocks and have entered the hanging wall dacite units. Still a ways to go to target.
Rainy River C Block Exploration:
C Block Hole C12-2 now at 857 metres this morning. Rocks becoming less mafic and now seeing alteration with sericite. All foliated. We are likely going to end the hole early tomorrow and move to the ne... (1 KB) |
|
Thu Jan 26, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Block Exploration:
East Burns Block Hole RR12-3 was at 265 metres this morning and has now passed out of upper cycle dacite and into the mafic units seen in all other holes in the area. Target still many metres out in front of the bit. Dip is still steep at 80 degrees.
Rainy River C Block Exploration:
C Block Hole C12-2 was at 827 metres this morning continuing through sequence of mafic tuffs. Dip has flattened to 32 degrees and we are still plan... (1 KB) |
|
Wed Jan 25, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Exploration:
Hole RR12-3 was at 171 metres this morning in the dacite hanging wall. Target still several days away.
Rainy River C Block Exploration:
Hole C12-2 is at 780 metres this morning in a sequence of mafic volcanic rocks. Access trail and collar for the next hole C12-3 has been opened by the skidder and will be ready for use within another day. We plan to drill the current hole to at least 900 metres. The idea is to drill both holes to the... (1 KB) |
|
Tue Jan 24, 2012 Bayfield Rainy River Drilling Update, NW Ontario Rainy River Eastern Burns Exploration:
Hole RR12-3 was at 52 metres this morning in the upper Dacite hanging wall volcanics. Should see the mafic volcanic sequence today and then enter main dacite hanging wall. Zone target depth is around 550 metres.
Rainy River C Block Exploration:
Hole C12-2 is at 710 metres this morning and drilling through a sheared sequence of sediments and mafic volcanic. We plan to drill the current hole to at least 900 metres.
Access trail and collar f... (1 KB) |
|
Mon Jan 23, 2012 Bayfield Rainy River Drilling Update, NW Ontario Eastern Burns Rainy River Exploration:
Hole RR12-2 passed out of the main zone and we ended the hole at 560 metres. The next Hole RR12-3 was moved 80 metres south of holes RR11-202 and RR12-3 and was started at a 357 degree azimuth and 83 degree dip. Target is high grade mineralization down plunge/dip from hole RR11-205. Casing is in and drilling of the hanging wall has started this morning.
C Block Rainy River Exploration:
Hole C12-2 is at 660 metres this morning and drilling throu... (2 KB) |
|
Fri Jan 20, 2012 Bayfield Rainy River Drilling Update, NW Ontario On the Burns Block, Rainy River drill Hole RR12-2 is at 383 metres this morning and is still drilling through the hanging wall dacite volcanics. The zone is expected to commence at approximately 450 metres. The hole is being drilled due west in order to cross-cut potential north south structures in an unexplored area within the main shear zone.
On the C Block, Rainy River drill Hole C12-2 is at 365 metres this morning and is continuing through a complex sequence of meta sediments, mafic dik... (1 KB) |
|
Tue Jan 17, 2012 Bayfield Rainy River Drilling Update, NW Ontario On the Burns Block, Rainy River drill Hole RR12-2 was at 160 metres this morning in hanging wall dacite and mafic volcanic unit.
On the C Block, the drill crew is running the casing for Rainy River drill Hole C12-2.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Jan 16, 2012 Bayfield Rainy River Drilling Update, NW Ontario On the Burns Block, Rainy River drill Hole RR12-1 was completed to 317 metres after hitting the main zone. The next hole RR12-2 is being drill at 270 Azimuth and 83 Dip from the same collar. Target is 50-100 metres east main zone from the collar. Will drill to about 500 metres. Hole RR12-2 was drilled to 45 metres this morning in hanging wall.
On the C Block, Rainy River drill Hole C12-1 was completed to 410 metres in sediment rock. Rig was moved to next hole C12-2 about 300 metres north from... (1 KB) |
|
Fri Jan 13, 2012 Bayfield Rainy River Drilling Update, NW Ontario On the Burns Block, Rainy River drill Hole RR12-1 is 230 metres this morning in quartz eyes dacite unit.
On the C Block, Rainy River drill Hole C12-1 is at 374 metres this morning and still in sediment unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Jan 12, 2012 Bayfield Rainy River Drilling Update, NW Ontario Drilling has resumed on Bayfield's Rainy River properties.
On Burns Block, drill Hole RR12-1 is being drilled at 50 degree inclination from the same collar as Hole RR11-205 (last year east fence hole with 83 degree dip). This morning RR12-1 was at 134 metres in mafic volcanic rock.
On the C Block, drill Hole C12-1 is being drilled at a 270 degree azimuth and 50 degree dip. C12-1 was at 264 metres this morning in pyroclastic volcanic rock (volcanic sediment).
Bob Marvin, P.Geo., CPG, VP ... (1 KB) |
|
Thu Dec 15, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 2, Rainy River drill Hole RR11-206 was at 420 metres this morning. We will continue drilling for the next day or two and then shut down for the Christmas break.
Rig 1 has shut down for the Christmas break.
Drilling will resume on the Burns Block and begin on the "C" Block in January.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Dec 7, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 2, Rainy River drill Hole RR11-204 was at 364 metres this morning in hanging wall dacite unit.
For Rig 1, Rainy River drill Hole RR11-202 was completed to 530 metres after intercepting foliated sericite altered main zone. The next hole RR11-205 is moving 30 metres east of hole RR11-202 and will be drilled at a 358 degree azimuth and 50 degree inclination.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the dr... (1 KB) |
|
Tue Dec 6, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 2, Rainy River drill Hole RR11-204 was at 250 metres this morning in hanging wall dacite unit.
For Rig 1, Rainy River drill Hole RR11-202 was at 497 metres this morning in foliated sericite altered zone.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Dec 5, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 2, Rainy River drill Hole RR11-204 was at 203 metres this morning in hanging wall dacite unit.
For Rig 1, Rainy River drill Hole RR11-202 was at 399 metres this morning in foliated sericite altered zone.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Fri Dec 2, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 2, Rainy River drill Hole RR11-203 was abandoned at 65 metres due to the azimuth turning too fast initially. The next hole RR11-204 is being drilled from the same setup but with an azimuth 10 more degrees to the south.
For Rig 1, Rainy River drill Hole RR11-202 was at 176 metres this morning.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Dec 1, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 2, Rainy River drill Hole RR11-200 was completed to 431 metres today after intercepting the foliated sericite altered main zone. The next hole RR11-203 was moved to 5 metres north of hole RR11-140. It is being drilled with a initial 270 degree azimuth and 60 degree inclination. This setup is planned to further delineate mineralization near south west corner.
For Rig 1, Rainy River drill Hole RR11-202 was at 89 metres today in quartz eyes dacite hanging wall.
Bob Marvin, P.Geo., ... (1 KB) |
|
Wed Nov 30, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 2, Rainy River drill Hole RR11-200 was at 370 metres this morning in foliated sericite altered main zone.
For Rig 1, Rainy River drill Hole RR11-201 was completed to 350 metres yesterday after intercerpting foliated sericite altered main zone. The next hole RR11-202 is being drilled at a initial 83 degree inclination from the same setup as hole RR11-201.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the dril... (1 KB) |
|
Tue Nov 29, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 2, Rainy River drill Hole RR11-200 was at 311 metres this morning in hanging wall dacite unit.
For Rig 1, Rainy River drill Hole RR11-201 was at 302 metres this morning in foliated sericite altered main zone.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Nov 28, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 2, Rainy River drill Hole RR11-200 was at 230 metres this morning in hanging wall dacite unit.
For Rig 1, Rainy River drill Hole RR11-201 was at 224 metres this morning in quartz eyes dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Fri Nov 25, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 2, Rainy River drill Hole RR11-200 was at 161 metres this morning in hanging wall dacite unit.
For Rig 1, Rainy River drill Hole RR11-201 was at 110 metres this morning in mafic volcanic unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Nov 24, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 2, Rainy River drill Hole RR11-200 was collared 15 metres east of hole RR10-4 with a initial 260 degree azimuth and 60 degree inclination. it was at 59 metres this morning. This setup is planned to further delineate mineralization around hole RR11-14.
For Rig 1, Rainy River drill Hole RR11-199 was completed to 521.8 metres yesterday. The next hole RR11-201 is being drilled at a 53 degree inclination from the same setup as hole RR11-199. It was at 28 metres in hanging wall dacite unit ... (1 KB) |
|
Wed Nov 23, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 2, Rainy River drill Hole RR11-197 was completed to 692 metres this morning after intercepting the foliated sericite altered main zone.
For Rig 1, Rainy River drill Hole RR11-199 was at 443 metres this morning in foliated sericite altered zone.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Nov 22, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 2, Rainy River drill Hole RR11-197 was at 638 metres this morning in foliated sericite altered main zone.
For Rig 1, Rainy River drill Hole RR11-199 was at 353 metres this morning in foliated sericite altered main zone. The plan is to move the drill to 30 metres east and drill a hole with 356 degree azimuth and 50 degree inclination.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that ar... (1 KB) |
|
Mon Nov 21, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 2, Rainy River drill Hole RR11-197 was at 600 metres this morning in foliated sericite altered main zone.
For Rig 1, Rainy River drill Hole RR11-199 was at 320 metres this morning in hanging wall dacite unit.
Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Fri Nov 18, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 2, Rainy River drill Hole RR11-197 was at 455 metres this morning and is in quartz feldspar porphyritic dacite unit.
For Rig 1, Rainy River drill Hole RR11-199 was at 149 metres this morning and is in quartz feldspar porphyritic dacite unit.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Nov 17, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 2, Rainy River drill Hole RR11-197 was at 365 metres this morning in quartz feldspar porphyritic dacite unit.
For Rig 1, Rainy River drill Hole RR11-198 was completed at 242.3 metres yesterday afternoon. The next hole RR11-199 was moved to 100 metres east of hole RR11-186, 60 metres from the east boundary. The hole is being drilled at a 358 degree azimuth and a 70 degree inclination and is at 35 metres this morning.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person ... (1 KB) |
|
Wed Nov 16, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 2, Rainy River drill Hole RR11-197 was at 284 metres this morning in quartz feldspar porphyritic dacite unit.
For Rig 1, Rainy River drill Hole RR11-198 was at 212 metres this morning in foliated sericite altered main zone.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Nov 14, 2011 Bayfield Rainy River Drilling Update, NW Ontario High Grade East West Infill Drilling
For Rig 2, Rainy River drill Hole RR11-197 with an intial azimuth at 255, inclination at 65 degrees looks good for a long run down and north turn into mineralized ground around hole RR10-18.
Northeast Burns Recon Exploration.
For Rig 1, we completed Rainy River drill Hole RR11-195 yesterday to total depth of 291 metres. Hole RR11-195 is located 50 metres due north of hole RR11-186.
We then moved 60 metres west-southwest and have started h... (1 KB) |
|
Thu Nov 10, 2011 Rainy River Resources' Preliminary Economic Assessment Anticipates 329,000 Ounces of Gold Annually Over 13+ Years at the Rainy River Gold Project ... (1 KB) |
|
Wed Nov 9, 2011 Bayfield Rainy River Drilling Update, NW Ontario High Grade Infill Drilling
For Rig 2, Rainy River drill Hole RR11-194 is at 458 metres this morning and entered the foliated, sericite altered zone at 456 metres. We are pulling for bit change right now. Hole should be done Friday.
NE Near Surface Recon Drilling
For Rig 1, Rainy River drill Hole RR11-193 was completed to the property boundary to 221 metres yesterday afternoon.
Rig 1 has been moved back west into a position 50 metres due north of hole RR11-186. This is allowing... (2 KB) |
|
Mon Nov 7, 2011 Bayfield Rainy River Drilling Update, NW Ontario High Grade Area Infill Program
For Rig 2, we collared Rainy River Drill Hole RR11-194 on the evening of the 3rd of November from the same set-up as hole RR11-189. The azimuth was moved 4 degrees north of that of hole RR11-189 and the inclination flattened 4.5 degrees to 57.5. The target remains the same, high grade intersection of hole RR10-52.
The hole is now at 260 metres and is tracking well, now at 56.5 inclination and 277.3 azimuth. All indications point to a close pass through th... (2 KB) |
|
Fri Nov 4, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River Drill Hole RR11-192 was at 313 metres this morning. Once this hole is completed we will move 30 metres east and drill another 50-70 degree pair of holes.
For Rig 2, Rainy River east to west Drill Hole RR11-189, targeting the high grade in hole RR10-52, was completed last night at 611 metres. Hole RR11-194 was collared last night from the RR11-189 set-up. The azimuth was moved 4 degrees north of that of hole RR11-189 and the inclination flattened 4.5 degrees to 57.5. ... (1 KB) |
|
Wed Nov 2, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River Drill Hole RR11-192 was at 133 metres this morning in argillitic sediment unit.
For Rig 2, Rainy River Drill Hole RR11-189 (not RR11-190) was at 503 metres this morning in foliated sericite altered zone.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Nov 1, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River Drill Hole RR11-191 was at 153 metres this morning in quartz feldspar porphyritic dacite hanging wall.
For Rig 2, Rainy River North Fence Drill Hole RR11-190 was at 342 metres this morning in quartz feldspar porphyritic dacite hanging wall.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Mon Oct 31, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River Drill Hole RR11-189 was completed to 188 metres, after intercepting foliated sericite altered zone. The next hole RR11-191 was moved 25 metres east of RR11-189 and is being drilled at a 358 degree azimuth and a 50 degree inclination. It was at 61 metres this morning.
For Rig 2, Rainy River North Fence Drill Hole RR11-190 was at 270 metres this morning.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person as defined by NI 43-101 and has provided and approv... (1 KB) |
|
Fri Oct 28, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River Drill Hole RR11-189 was at 86 metres this morning in the quartz feldspar porphyritic dacite hanging wall.
For Rig 2, Rainy River North Fence Drill Hole RR11-190 was at 89 metres this morning in the quartz feldspar porphyritic dacite hanging wall.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Oct 27, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River North Fence Drill Hole RR11-187 was completed to 266 metres, after intercepting the foliated sericite altered zone. The next hole RR11-189 was moved 75 metres south of hole RR11-105 and is being drilled at a 270 degree azimuth and a 60 degree inclination. This setup is planned to further delineate mineralization around hole RR10-52.
For Rig 2, Rainy River Centre Fence Drill Hole RR11-188 was completed to 125 metres. The next hole RR11-190 was moved 100 metres north and... (1 KB) |
|
Tue Oct 25, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River North Fence Drill Hole RR11-187 was at 220 metres this morning in the foliated sericite altered main zone.
For Rig 2, Rainy River Centre Fence Drill Hole RR11-186 was completed to 299 metres after intercepting the foliated sericite altered zone. The next hole RR11-188 is being drilled at a 70 degree inclination from the same setup as hole RR11-186.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person as defined by NI 43-101 and has provided and approved ... (1 KB) |
|
Mon Oct 24, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River North Fence Drill Hole RR11-185 was completed to 273 metres after intercepting the foliated sericite altered main zone. The next hole RR11-187 is being drilled at a 54 degree inclination from the same setup as hole RR11-185.
For Rig 2, Rainy River Centre Fence Drill Hole RR11-183 was completed to 272 metres after intercepting the foliated sericite altered zone. The next hole RR11-186 was moved to 30 metres east from hole RR11-183 and is being drilled at a 50 degree incl... (1 KB) |
|
Fri Oct 21, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River North Fence Drill Hole RR11-185 was at 32 metres this morning and is in the quartz feldspar porphytitic dacite hanging wall.
For Rig 2, Rainy River Centre Fence Drill Hole RR11-183 was at 254 metres this morning and is in the foliated sericite altered main zone .
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Oct 20, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River North Fence Drill Hole RR11-184 was completed to 137 metres this morning after intercepting the foliated sericite altered zone. The next hole RR11-185 is being moved 16 metres southwest of hole RR11-52 collar and will be drilled at a 270 degree azimuth and a 58 degree inclination. The purpose of this drilling is to further delineate mineralization around hole RR10-15.
For Rig 2, Rainy River Centre Fence Drill Hole RR11-183 was at 165 metres morning and is in the quartz... (1 KB) |
|
Wed Oct 19, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River North Fence Drill Hole RR11-184 was at 68 metres this morning and is in the foliated sericite altered zone.
For Rig 2, Rainy River Centre Fence Drill Hole RR11-183 was at 113 metres morning and is in the quartz feldspar porphytitic dacite unit.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Oct 18, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River North Fence Drill Hole RR11-182 was completed to 119 metres last night after intercepting the foliated sericite altered zone. The next hole RR11-184 is being drilled at a 45 degree inclination from the same setup as hole RR11-182.
For Rig 2, Rainy River Centre Fence Drill Hole RR11-183 was at 53 metres morning and is in the quartz feldspar porphytitic dacite unit.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person as defined by NI 43-101 and has provide... (1 KB) |
|
Mon Oct 17, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River North Fence Drill Hole RR11-181 was completed to 122 metres last night after intercepting foliated sericite altered zone. The next hole RR11-182 is being drilled at a 65 degree inclination from the same setup as hole RR11-181.
For Rig 2, Rainy River Centre Fence Drill Hole RR11-179 was completed to 330 metres this morning after intercepting foliated sericite altered zone. The next hole RR11-183 was moved 40 metres north of hole RR11-179 and is being drilled at a 358 de... (1 KB) |
|
Fri Oct 14, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River North Fence Drill Hole RR11-180 was completed to 131 metres this morning after intercepting the foliated sericite altered zone. The next hole RR11-181 is being drilled at a 55 degree inclination from the same setup as hole RR11-180.
For Rig 2, Rainy River Centre Fence Drill Hole RR11-179 was at 185 metres this morning and is in the quartz feldspar porphyritic dacite unite.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person as defined by NI 43-101 and ha... (1 KB) |
|
Thu Oct 13, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River North Fence Drill Hole RR11-180 was at 48 metres this morning and is in foliated sericite altered dacite unit.
For Rig 2, Rainy River Centre Fence Drill Hole RR11-179 was at 140 metres this morning and is in quartz feldspar porphyritic dacite unite.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Oct 12, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River North Fence Drill Hole RR11-178 was completed to 110 metres last night after intercepting the foliated sericite altered zone. The next hole RR11-180 was moved 20 metres east and 15 metres north of hole RR11-64 and is being drilled at a 270 degree azimuth and a 60 degree inclination.
For Rig 2, Rainy River Centre Fence Drill Hole RR11-163 was completed to 778 metres after intercepting several foliated sericite altered zones. The next hole RR11-179 was moved 30 metres eas... (1 KB) |
|
Tue Oct 11, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River North Fence Drill Hole RR11-176 was completed to 107 metres after intercepting foliated sericite altered zone. The next hole RR11-177 is being drilled at a 51 degree inclination with the same setup as RR11-176.
For Rig 2, Rainy River Centre Fence Drill Hole RR11-163 was at 778 metres this morning and intercepted the foliated sericite altered zone from 681m to 745m.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person as defined by NI 43-101 and has provid... (1 KB) |
|
Fri Oct 7, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River North Fence Drill Hole RR11-174 was completed to 92 metres last night after intercepting the foliated sericite altered zone. The next hole RR11-175 is being drilled at a 75 degree inclination from the same setup as hole RR11-174 and was at 20 metres this morning.
For Rig 2, Rainy River Centre Fence Drill Hole RR11-163 was at 625 metres this morning and intercepted more foliated sericite altered zones.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person a... (1 KB) |
|
Wed Oct 5, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River North Fence Drill Hole RR11-172 was completed to 101 metres last night after intercepting the foliated sericite altered zone. The next hole RR11-173 is being drilled at a 51 degree inclination from the same setup as hole RR11-171 and was at 45 metres this morning.
For Rig 2, Rainy River Centre Fence Drill Hole RR11-163 was at 548 metres this morning and intercepted another foliated sericite altered sericite zone.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualif... (1 KB) |
|
Tue Oct 4, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River North Fence Drill Hole RR11-171 was completed to 119 metres last night after intercepting the foliated altered sericite zone. The next hole RR11-172 is being drilled at a 45 degree inclination from the same setup as hole RR11-171 and was at 45 metres this morning.
For Rig 2, Rainy River Centre Fence Drill Hole RR11-163 was at 500 metres this morning.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person as defined by NI 43-101 and has provided and approved... (1 KB) |
|
Mon Oct 3, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River North Fence Drill Hole RR11-170 was completed to 123 metres yesterday afternoon after intercepting foliated sericite altered zone. The next hole RR11-171 was moved to 30 metres west of RR11-170 with a 358 degree azimuth and 60 degree inclination. Hole RR11-171 was at 50 metres this morning.
For Rig 2, Rainy River Centre Fence Drill Hole RR11-163 was at 440 metres this morning and intercepted first foliated sericite altered zone. It is being drilled further for the secon... (1 KB) |
|
Fri Sep 30, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River North Fence Drill Hole RR11-167 was completed to 101 metres last night after intercepting the foliated altered sericite zone. The next hole RR11-168 was moved to 30 metres west of RR11-167 with initial 358 degree Azimuth and 60 degree inclination and was at 35 metres this morning.
For Rig 2, Rainy River Centre Fence Drill Hole RR11-163 was at 233 metres this morning and is in hanging wall dacite unit.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person ... (1 KB) |
|
Thu Sep 29, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River North Fence Drill Hole RR11-166 was completed to 92 metres last night. The next hole RR11-167 was at 23 metres this morning and is being drilled at a 70 degree inclination from the same set up as hole RR11-167.
For Rig 2, Rainy River Centre Fence Drill Hole RR11-163 was at 170 metres this morning and is in the hanging wall dacite unit.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling u... (1 KB) |
|
Wed Sep 28, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River North Fence Drill Hole RR11-165 was completed to 101 metres last night. The next hole RR11-166 is being drilled at a 40 degree inclination from the same set up as hole RR11-165.
For Rig 2, Rainy River Centre Fence Drill Hole RR11-163 was at 65 metres this morning and is in the hanging wall dacite unit.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Sep 27, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River North Fence Drill Hole RR11-162 was completed to 104 metres this morning. The next hole RR11-164 was moved to 17 metres south and 11 metres east of the hole RR11-74.
For Rig 2, Rainy River Centre Fence Drill Hole RR11-160 was completed to 371 metres after intercepting foliated sericite altered main zone yesterday afternoon. The next hole RR11-163 is being drilled at a 70 degree inclination with the same set up as hole RR11-160.
Bob Marvin, P.Geo., CPG, Project Manag... (1 KB) |
|
Mon Sep 26, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, Rainy River North Fence Drill Hole RR11-162 was at 26 metres this morning in hanging wall dacite unit.
For Rig 2, Rainy River Centre Fence Drill Hole RR11-160 was at 279 metres this morning in the foliated sericite zone.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Fri Sep 23, 2011 Bayfield Rainy River Drilling Update, NW Ontario Far North Fence Rainy River Burns Block Infill Drilling:
First infill set-up west and south of hole RR11-71 was completed with a sixth hole RR11-155 which ended at 122 metres. Entered zone at 25 metres. Angle was 65 degrees with north azimuth.
Second infill set-up still being drilled, now on the thrid hole from the set-up. First hole RR11-156 ended at 113 metres. Entered zone at 22 metres. Angle was 55 degrees with north azimuth. Second hole RR11-157 ended at 110 metres. Entered zone at ... (2 KB) |
|
Fri Sep 16, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, North Fence Rainy River Drill Hole RR11-148 was completed to 176 metres yesterday afternoon after encountering main foliated sericte altered zone. The next hole RR11-149 was moved 15 metres south of hole RR11-74 and will be drilled at 358 degree azimuth and 45 degree inclination.
For Rig 2, South Fence Rainy River Drill Hole RR11-144 was drilled to 625 metres this morning and is in quartz feldspar porphyritic dacite unit.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualifi... (1 KB) |
|
Wed Sep 14, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, North Fence Rainy River Drill Hole RR11-147 was completed to 212 metres yesterday afternoon after encountering main foliated sericte altered zone. The next hole RR11-148 was moved to 30 metres east of hole RR11-139 and will be drilled at 358 degree azimuth and 45 degree inclination.
For Rig 2, South Fence Rainy River Drill Hole RR11-144 was drilled to 515 metres this morning and is in the quartz feldspar porphyritic dacite unit.
Bob Marvin, P.Geo., CPG, Project Manager is the ... (1 KB) |
|
Tue Sep 13, 2011 Bayfield Rainy River Drilling Update, NW Ontario For Rig 1, North Fence Rainy River Drill Hole RR11-146 was completed to 86 metres yesterday afternoon. The next hole RR11-147 is being drilled at a 70 degree inclination from the same set up as hole RR11-145 and was at 68 metres this morning.
For Rig 2, South Fence Rainy River Drill Hole RR11-144 was at 428 metres this morning and is in the quartz feldspar porphyritic dacite unit. We expect the main zone about 530 metres.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person as... (1 KB) |
|
Mon Sep 12, 2011 Bayfield Rainy River Drilling Update, NW Ontario For rig one, North Fence Rainy River Drill Hole RR11-146 was drilled to 60 metres this morning. Intercepted sericite altered mineralization zone near the surface.
For rig two, South Fence Rainy River Drill Hole RR-144 was drilled to 347 metres this morning and is in the quartz feldspar porphyritic dacite unit.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Fri Sep 9, 2011 Bayfield Rainy River Drilling Update, NW Ontario For rig one, North Fence Rainy River Drill Hole RR11-145 was drilled to 27 metres this morning and is in the quartz eyes feldspar porphyritic dacite unit.
For rig two, South Fence Rainy River Drill Hole RR-144 was drilled to 92 metres this morning and is in the quartz eyes feldspar porphyritic dacite unit.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Thu Sep 8, 2011 Bayfield Rainy River Drilling Update, NW Ontario For rig one, North Fence Rainy River Drill Hole RR11-145 has started and is being drilled at 358 degree azimuth and 45 degree inclination. Hole located 35 metres south of hole RR11-131.
For rig two, South Fence Rainy River Drill Hole RR-144 has started and is being drilled at 355 degree azimuth and 85 degree inclination from the same collar as the hole RR11-140.
Bob Marvin, P.Geo., CPG, Project Manager is the Qualified Person as defined by NI 43-101 and has provided and approved the drill... (1 KB) |
|
Thu Sep 1, 2011 Bayfield Rainy River Drilling Update, NW Ontario Drilling will resume on Bayfield's Burns Block property in Rainy River, NW Ontario on September 7th.
Robert Marvin, P.Geo, CPG. Exploration Manager for Bayfield Ventures is the Qualified Person, as defined by National Instrument 43-101, and has approved the information posted here. (1 KB) |
|
Wed Aug 31, 2011 New 3D Video of Bayfield's Burns Block in Rainy River, Ontario Showing Drilling to Date Below is a link to a new 3D Video of Bayfields' Burns Block, Rainy River, Ontario showing drilling to date:
Below is a link that shows a cross section (looking east) of the high grade holes drilled on Bayfield's Burns Block and a chart of the high grade holes:
... (3 KB) |
|
Fri Aug 26, 2011 Burns Block Gold & Silver Assay Chart for all Drill Holes March 2010 - August 2011 ... (1 KB) |
|
Fri Aug 12, 2011 Bayfield Rainy River Drilling Update, NW Ontario For rig three, South Fence Rainy River Drill Hole RR11-140 has been completed to 499 metres. Intersected target zone at 453 metres.
The drillers will now take a break with drilling to resume in a couple of weeks. Bayfield is currently backlogged with pending assays for approx. 60 additional holes completed.
Shane Hu, P.Geo., Project Geologist is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Tue Aug 9, 2011 Bayfield Rainy River Drilling Update, NW Ontario For rig one, Far North Rainy River Drill Hole RR11-137 was completed to 98 metres. Far North Fence east extension. Rig shut down.
For rig two, North Fence Rainy River Drill Hole RR-143 completed to 82 metres. Steeper hole under RR11-142, same target. Rig is shutdown.
For rig three, South Fence Rainy River Drill Hole RR11-140 was at 432 metres this morning.
Shane Hu, P.Geo., Project Geologist is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling upd... (1 KB) |
|
Fri Aug 5, 2011 Bayfield Rainy River Drilling Update, NW Ontario For rig one, Central Fence Rainy River Drill Hole RR11-135 was completed to 359 metres. Eastward extesion drilling on central fence. Rig one then moved back to Far North Fence to continue to do east extension drilling there. Far North Fence Drill Hole RR11-137 was at 47 metres this morning in hanging wall dacites.
For rig two, North Fence Rainy River Drill Hole RR-141 was at 80 metres this morning. Steeper hole under hole RR11-139, same target. Have not looked at core yet.
For rig... (2 KB) |
|
Tue Aug 2, 2011 Bayfield Rainy River Drilling Update, NW Ontario For rig one, Central Fence Rainy River Drill Hole RR11-135 was at 167 metres this morning in hanging wall dacites. Eastward extension drilling on central fence.
For rig two, North Fence Rainy River Drill Hole RR-131 was at 240 metres this morning.
For rig three, Central Fence Rainy River Drill Hole RR11-132 was completed to 260 metres. Intersected sericite alteration and pyrite in main zone then into hard foot dacite. The next Hole RR-133 was at 22 metres this morning. In bleached hangin... (1 KB) |
|
Fri Jul 29, 2011 Bayfield Rainy River Drilling Update, NW Ontario For rig one, Far North Fence Rainy River Drill Hole RR11-126 was at 126 metres this morning In locally well altered hanging wall dacites.
For rig two, North Fence Rainy River Drill Hole RR11-130 was completed to 191 metres. The next Hole RR11-131 was at 58 metres this morning in hanging wall dacites.
For rig three, Central Fence Rainy River Drill Hole RR11-124 was completed to 368 metres. Drill hole RR11-132 is at 24 metres In hanging wall dacite, First hole of three hole fan.
Shane... (1 KB) |
|
Thu Jul 28, 2011 Bayfield Rainy River Drilling Update, NW Ontario For rig one, Far North Fence Rainy River Drill Hole RR-129 has been completed to 62 metres. Zone starts at 41 metres at base of hanging wall. Drill Moved to Central Fence. The next Hole RR-126 is located 90 metres east of hole RR11-124. Eastward extension drilling on central fence.
For rig two, North Fence Rainy River Drill Hole RR-130 was at 159 metres this morning. 50 metres ENE of hole RR11-125. No zone intersected yet.
For rig three, Central Fence Rainy River Drill Hole RR11-124 was at... (1 KB) |
|
Wed Jul 27, 2011 Bayfield Rainy River Drilling Update, NW Ontario For rig one, Far North Fence Rainy River Drill Hole RR11-128 has been completed to 83 metres. Entered main zone at 47 metres. The next Hole RR-129 was at 43 metres this morning.
For rig two, North Fence Rainy River Drill Hole RR11-125 has been completed to 230 metres. The next Hole RR11-130 was at 58 metres this morning. Test for main zone 450 metres east of west boundary. Drilling hanging wall dacites.
For rig three, Central Fence Rainy River Drill Hole RR11-124 was at 236 metres this mo... (1 KB) |
|
Tue Jul 26, 2011 Bayfield Rainy River Drilling Update, NW Ontario For rig one, Far North Fence Rainy River Drill Hole RR-127 has been completed to 85 metres. Moved 30 metres east of hole RR11-101. Passed under the hanging wall into the zone at 55 metres. The next Hole RR-128 was at 67 metres this morning. East extesnsion of shallow portion of main zone. Entered main zone at 47 metres.
For rig two, North Fence Rainy River Drill Hole RR11-125 was at 205 metres this morning. Still no zone in dacites. Shallow main zone, north-central portion of property.
For... (1 KB) |
|
Fri Jul 22, 2011 Bayfield Rainy River Drilling Update, NW Ontario For rig one, Far North Fence Rainy River Drill Hole RR-119 has been completed to 106 metres. Zone started at 37 metres. Started to case Hole RR-120, a 52 degree angle hole from same set-up.
For rig two, North Fence Rainy River Drill Hole RR11-116 was at 146 metres this morning. Still in hanging wall dacites. Shallow main zone, north-central portion of property.
For rig three, Central Fence Rainy River Drill Hole RR11-122 was at 75 metres this morning. 40 metres east of hole RR11-107. Drill... (1 KB) |
|
Thu Jul 21, 2011 Bayfield Rainy River Drilling Update, NW Ontario For rig one, Far North Fence Rainy River Drill Hole RR-118 has been completed to 118 metres. Zone intersected from 46 metres. Now getting set to case a 60 degree angle hole from same set-up.
For rig two, North Fence Rainy River Drill Hole RR11-115 was completed to 276 metres. The next hole RR11-116 was at 56 metres this morning in hanging wall dacites. Shallow main zone, north-central portion of property.
For rig three, Central Fence Rainy River Drill Hole RR11-107 was completed to 1045 me... (1 KB) |
|
Wed Jul 20, 2011 Bayfield Rainy River Drilling Update, NW Ontario For rig one, Far North Fence Rainy River Drill Hole RR11-117 was completed to 125 metres. The next hole RR-118 has been cased to explore envelope in area of high-grade hole RR11-71, east extesion.
For rig two, North Fence Rainy River Drill Hole RR11-115 was at 263 metres this morning. Entered second zone. Will continue drilling.
For rig three, Central Fence Rainy River Drill Hole RR11-107 was at 989 metres this morning. Drilling continuing through foliated dacites.
Shane Hu, P.Geo., Pro... (1 KB) |
|
Tue Jul 19, 2011 Bayfield Rainy River Drilling Update, NW Ontario For rig one, South Fence Rainy River Drill Hole RR11-108 was completed at 926 metres. The drill was moved to far north fence, 20 metres east of holes RR11-64/65/66. The first hole RR-117 has a current setup with 359 degree azimuth, 80 degree inclination and was at 116 metres this morning. Started the main zone at 56 metres.
For rig two, North Fence Rainy River Drill Hole RR11-115 was at 194 metres this morning. Entered main zone at 165 metres.
For rig three, Central Fence Rainy River Dril... (1 KB) |
|
Mon Jul 18, 2011 Bayfield Rainy River Drilling Update, NW Ontario For rig one, South Fence Rainy River Drill Hole RR11-108 was completed to 923 metres. Rig being moved to Far North Fence.
For rig two, North Fence Rainy River Drill Hole RR11-114 was completed to 194 metres. Hole RR11-115 is being drilled from the same collar and is at 14 metres this morning.
For rig three, Central Fence Rainy River Drill Hole RR11-107 is at 902 metres this morning.
Shane Hu, P.Geo., Project Geologist is the Qualified Person as defined by NI 43-101 and has provided a... (1 KB) |
|
Fri Jul 15, 2011 Burns Block High Grade Holes Cross Section ... (98 KB) |
|
Fri Jul 15, 2011 Bayfield Rainy River Drilling Update, NW Ontario For rig one, South Fence Rainy River Drill Hole RR11-108 was at 816 metres this morning.
For rig two, North Fence Rainy River Drill Hole RR11-114 was at 56 metres this morning in hanging wall dacites. 30 metres east of hole RR11-113. Target is shallow main zone.
For rig three, Central Fence Rainy River Drill Hole RR11-107 was at 852 metres this morning. Will likely end hole in the morning and move east to start next fan of holes.
Shane Hu, P.Geo., Project Geologist is the Qualified Pe... (1 KB) |
|
Thu Jul 14, 2011 Bayfield Rainy River Drilling Update, NW Ontario For rig one, South Fence Rainy River Drill Hole RR11-108 was at 782 metres this morning.
For rig two, North Fence Rainy River Drill Hole RR11-113 was at 242 metres this morning.
For rig three, Central Fence Rainy River Drill Hole RR11-107 was at 815 metres this morning. We are in yet another zone, entered around 788 metres.
Shane Hu, P.Geo., Project Geologist is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
|
Wed Jul 13, 2011 Bayfield Rainy River Drilling Update, NW Ontario For rig one, South Fence Rainy River Drill Hole RR11-108 was at 726 metres this morning.
For rig two, North Fence Rainy River Drill Hole RR11-113 was at 170 metres this morning. Entered main zone at 159 metres.
For rig three, Central Fence Rainy River Drill Hole RR11-107 was at 752 metres this morning.
Shane Hu, P.Geo., Project Geologist is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here. (1 KB) |
Note: Only the first 300 of 332 items (90%) are shown. |