Bayfield Ventures Corp.TSX-V : BYV

Update from the Field

Email 'Bayfield Rainy River Drilling Update, NW Ontario' to a friendShow printable version of 'Bayfield Rainy River Drilling Update, NW Ontario' in a New Window
 Mon Jan 30, 2012
Bayfield Rainy River Drilling Update, NW Ontario
    Publisher: Don Myers: Director
    Author: Bob Marvin, P.Geo, CPG, VP of Exploration & Qualified Person

 Rainy River Eastern Burns Block Exploration:

Burns East Hole RR12-3 is at 461 metres this morning and still cutting through the hanging wall dacites. Dip is approx. 79 degrees and the azimuth is 3 degrees.

Rainy River C Block Exploration:

Hole C12-2 was completed to 881.4 metres. Final dip was 30 degrees and azimuth was 334 degrees. Hole ended in mafic tuffs. C Block hole C12-3 getting cased this morning.

Rainy River B Block Exploration:

B Block Hole B12-1 advancing rapidly, now at 242 metres this morning and getting near the taget at around 475 metres. Next hole spotted 170 metres south of hole B12-1 near the south boundary and will also be drilled to the west.

Bob Marvin, P.Geo., CPG, VP of Exploration is the Qualified Person as defined by NI 43-101 and has provided and approved the drilling updates that are posted here.
 
 

You can view the Previous Update from the Field item: Tue Jan 31, 2012, Bayfield Rainy River Drilling Update, NW Ontario

You can view the Next Update from the Field item: Fri Jan 27, 2012, Bayfield Rainy River Drilling Update, NW Ontario

You can return to the main Update from the Field page, or press the Back button on your browser.